Ted Cruz (R-TX)
Dyess Air Base Access Infrastructure Design Act
A Republican bill with no cosponsors
Last activity — Read twice and referred to the Committee on Armed Services.
In committee
Introduced and handed to a committee in the chamber it started in.
The committee holds it, and most bills are never heard from again. A hearing or a committee vote would be news; silence is the usual outcome, and it kills the bill without anyone voting against it.
Its path through Congress
- Introduced
- In Committee
What this bill would do
This bill, known as the "Dyess Air Base Access Infrastructure Design Act," directs the Secretary of the Air Force to begin planning and design for two specific infrastructure projects. These projects involve the Tye Gate and the Arnold Gate at Dyess Air Force Base in Texas. The Tye Gate project is set to not exceed $17,000,000, while the Arnold Gate project is set to not than $12,065,000. The act specifies that these activities must be funded using existing amounts available to the Department of the Air Force for military construction.
Yes· 3 of 7
- Scored +3
Does this repair or build roads and bridges?
Addresses essential access gate infrastructure at the military installation.
- Scored +2
Is this likely to create jobs?
Infrastructure planning and design may stimulate local construction jobs.
- Scored +1
Is this likely to grow the economy?
Infrastructure modernization can contribute to localized economic activity.
The opposite
No question was scored the opposite.
Who it would affect, and how
Potential Positive Impacts for People
-
Infrastructure Improvements at Dyess Air Force Base: The bill requires planning and design for improvements to the Tye Gate and Arnold Gate (Section 2(a) and 2(b)), which addresses infrastructure needs at the base.
-
Structured Design for Tye Gate: The design activities for the Tye Gate are directed to consider minimal utility crossings, limited conflicts with built infrastructure, and simplified phasing (Section 2(a)(3)).
-
Addressing Complexities at Arnold Gate: The design activities for the Arnold Gate are required to account for site congestion, multiple utility connections, phased construction, and complex traffic coordination (Section 2(b)(3)).
Potential Negative Impacts for People
- Cost Caps on Planning and Design: For the Tye Gate, planning and design costs may not exceed seven percent of the project amount (Section 2(a)(2)). For the Arnold Gate, these costs may not exceed eight percent of the project amount (Section 2(b)(2)).
Groups and Interests Ranking
Every group the model scored this bill for, from -10 to +10. Tap or hover a score for the reason it gave.
- Economy And Finance
- Is this likely to create jobs? — Infrastructure planning and design may stimulate local construction jobs. Is this likely to grow the economy? — Infrastructure modernization can contribute to localized economic activity. Does this make the government pay for what it commits to? — The bill utilizes existing funds rather than requesting new appropriations.
- Demographic And Interest Groups
- Would business owners be better off under this? — Potential for local construction and design contract opportunities. Would people in rural areas be better off under this? — Provides localized infrastructure investment in Texas. Would union members be better off under this? — Infrastructure projects often involve unionized construction labor.
- Environment Energy And Infrastructure
- Does this repair or build roads and bridges? — Addresses essential access gate infrastructure at the military installation.
- 6/18/2025
- Read twice and referred to the Committee on Armed Services.
- Introduced in Senate
One bill Congress.gov lists as related to this one — companions in the other chamber, earlier versions, and bills this one absorbed or was folded into.